Construction on this site, wedged between a church and surrounding houses, and close to a mainline railway line presented the design team and Contractor some interesting challenges.
Haworth McCall’s structural and civil engineering practical design minimised the complications that the site imposed. The result of close collaboration with the rest of the team meant that the building was delivered on time and to an excellent standard.
Architect – WS Planning and Architecture
Client – Quantum Design and Build Ltd.